  1. How to keep the bottom cover under piling?

Ans: 1 feet 6 inches.

  1. What is the lowest cover of the site below piling?

Ans: 3 inches.

  1. How much extra casting on piling?

Ans: 3 feet 6 inches to 4 feet.

  1. How many rods are used in piling at least?

Ans: 6th

  1. How to ensure the side cover of piling.

Ans: Using blocks.

  1. What is the minimum of pile cap’s bottom, top and side coverings?

Ans: 3 Inches.

  1. How to keep the short column side coverings the lowest?

Ans: 2 inches to 3 inches.




Civil Engineering Important Information: Substructure

  1. What are the minimum of Grad beam bottom, top and side coverings?

Ans: 2 inches.

  1. What are the minimum of basement slab (Billow ground level) bottom, top and side coverings?

Ans: 2 inches.

  1. How many ratios are given in the casting of piling?

Ans: 1:1.5:3.

  1. What kind of ratio is?

Ans: There are 3 types of ratio.  (1:1.25:2.5), (1:1.5:3), (1:2:4)

  1. What is the size of the rod barrier cable?




Ans: 22 gaze.

13. What are the tools used in piling?

Ans: Chisel, Piling Wing Machine, Mixer Machine, Welding Machine, Water Pump, Hammer, Tremie Pipe, Hand tools, etc.

 